- The corosync standards based cluster framework TODO list
- Last Updated: May 26, 2006
- P1 items are to be implemented before Wilson release. P2 items may be
- implemented in Wilson if interested parties provide patches. P3 items are
- targeted for Humphrey.
- Generic Items
- -------------
- * P1 32/64 bit cross-endian must be working.
- * P2 Itemize any changes required for AIS B.02.01 in the TODO list.
- * P2 doxygen-ize the include and lib directories.
- * P2 There are many TODOs in the code that need attention.
- * P2 Implement static voting virtual synchrony filter.
- * P3 Integrate with rgmanager system.
- * P3 doxygen-ize the exec directory.
- * P3 Advanced Synchronization Engine needed to synchronize data without
- long blocking delays during configuration changes.
- Totem
- -----
- * P1 Test scalability to 128 processors.
- * P1 Implement safe message delivery (for both Wilson and Picacho).
- * P1 Add mechanism to reenable a redundant ring after that ring has been
- declared faulty and then repaired by the system administration.
- * P1 In redundant ring configuration disallow binding to localhost interface.
- * P2 Flush totem messages during RECOVERY state that are in the
- new_message_queue.
- * P2 Turn totem layer into an LCR component.
- * P3 Implement the totem multiring protocol.
- YKD Virtual Synchrony Filter
- ----------------------------
- * P1 32/64 bit cross-endian must be working.
- * P2 Scale to 128 processors.
- LCR
- ---
- * P2 Finish live component replacement services.
- Checkpointing
- -------------
- * P1 32/64 bit cross-endian must be working.
- * P1 There is a bug in that iteration doesn't work under heavy load that
- must be fixed.
- * P1 Creation/deletion of checkpoints should be done using SAFE messaging.
- * P1 The checkpoint unlink operation doesn't work as per specification. The
- specification says that a checkpoint unlink should then allow a new
- checkpoint with the same name to be created. All cluster members using
- the old checkpoint continue to use the old checkpoint until they all
- stop using the checkpoint, at which point the checkpoint should be removed
- from the cluster.
- * P2 Conformance testing via SAF-TEST needs to reach 100%.
- Distributed Locking Service
- ---------------------------
- * P1 32/64 bit cross-endian must be working.
- * P1 Distributed locking needs configuration change support.
- * P1 Provide kernel-based DLM service handler for distributed locking.
- * P2 Conformance testing via SAF-TEST needs to reach 100%.
- Messaging Service
- -----------------
- * P2 32/64 bit cross-endian must be working.
- * P2 Finish implementation.
- * P2 Conformance testing via SAF-TEST needs to reach 100%.
- Availability Management Framework
- ---------------------------------
- * P1 32/64 bit cross-endian must be working.
- * P1 Finish next generation state machine design.
- * P1 Implement next generation state machine design.
- * P2 Conformance testing via SAF-TEST needs to reach 100%.
- Logging Service
- ---------------
- * P2 32/64 bit cross-endian must be working.
- * P2 Design and implement.
- * P3 Conformance testing via SAF-TEST needs to reach 100%.
- IMMS
- ----
- * P3 32/64 bit cross-endian must be working.
- * P3 Design and implement morphing the configuration object database.
- * P3 Conformance testing via SAF-TEST needs to reach 100%.
- Cluster Membership
- ------------------
- * P1 32/64 bit cross-endian testing. Code completed and believed to be correct.
- Eventing
- --------
- * P1 32/64 bit cross-endian must be working.
- Closed Process Groups
- ---------------------
- * P1 32/64 bit cross-endian must be working.
- Extended Virtual Synchrony Passthrough Interface
- ------------------------------------------------
- * P1 32/64 bit cross-endian must be working.
- * P1 Modify man pages to match new API semantics.
- * P1 Add mechanism to get redundant ring information from EVS interface.
- IPC
- ---
- * There are no TODOs for the IPC system.
- SYNC
- ----
- * P1 32/64 bit cross-endian must be working.
|